Cork spray is like a thermal blanket wrapped around your building and it has a thermal conductivity rating of 0.086, stucco is 01.00. Cork is flexible, mould reststant, bug and rodent resistant, Color fade is 1% / year (paint and stucco is up to 10% / year). It has an 18 decibel sound rating. Cork spray is less expensive than stucco.
Learn Moregate in both processes, the rotary gun for dry-mix shotcrete, and more efficient concrete pumps for wet-mix shotcrete were introduced. Many improvements were made to wet-mix equipment, primarily concrete pumps and materials, in the 1970s and 1980s. These improvements allowed pumping low-slump shotcrete mixtures longer distances at greater volumes.
Learn MoreThe term Gunite refers to the "dry spray method" of spraying concrete. We use a gunite machine for this type of application dry batched material is fed into the machines hopper where it if forced down the line by compressed air to the nozzle gun. The nozzle gun has a water tap fitted to it which the nozzleman controls to hydrate the dry
Learn MoreBlastcrete offers a complete product line that consists of concrete placement equipment, concrete mixers and pumps, gypsum mixers and pumps, shotcrete and gunite equipment, and related products. The company serves commercial and residential construction, ICF and SCIP building systems, refractory and underground markets. MX-10 Mixer-Pump.
Learn MoreBlock, brick, or soft concrete are still the only recommended materials to use a dry core bit to drill. Horizontal drilling is preferable to vertical when drilling dry because the dust is not extracted efficiently leading to slower drilling and more binding of the bit. A dust "muzzle" can be used with a vacuum to contain the slurry from wet
Learn MoreThe production of value-added products from renewable raw materials is Borregaard's strategy. GEA (Düsseldorf, Germany; www.gea.com) is supporting its customer with the supply of a turnkey plant for the spray drying of lignosulfonate in the double-digit million range.The solution also includes a new silo for feeding stored powder materials into the plant's packaging system and a large wet
Learn MoreSprayed concrete can use the same steel reinforcement as poured concrete or precast concrete. Typical shrinkage ranges from 0.06 to 0.10 percent after 28 days of drying. This is typically slightly higher than poured concrete of similar strength. Sprayed concrete must be protected from rain until it obtains its final set, usually four or five hours.
Learn MoreMoisture in the concrete. Today, most coating manufacturers require concrete substrates to be dry (<5% moisture content) with low vapor transmission (< 3-5lbs per 1000 sq. ft./24 hours) before applying most types of membranes. This applies to both new and existing concrete substrates, although each may have its own set of moisture-related problems.
Learn MoreWhen waiting for concrete to dry, keep these timeframes in mind: 24 to 48 hours - after inital set, forms can be removed and people can walk on the surface. 7 days - after partial curing, traffic from vehicles and equipment is okay. 28 days - at this point, the concrete should be fully cured.
Learn MoreThere are essentially two methods of application: the dry process and the wet process, typically installed by different specialist contractors and equipment. Both use high velocity air to propel. Dry process sprayed concrete: a predetermined dry mix of cement and aggregate is propelled through a spraying nozzle, where a finely atomised spray of
Learn MoreWe supply polyurethane and polyurea industrial products, containment solutions and spray equipment for coating a wide range of applications. When applied to containment tanks and spill berms, the leak proof barrier prevents oil and other hazardous chemicals from causing substantial damages and clean-up costs.